With a solid knowledge of both construction techniques and plant operations, EPS determines the optimal construction strategies based on building codes, permitting requirements, project schedule, and budget. Multi-skilled EPS project managers ensure efficient facilities.

Factory layout

Piping systems

Control systems

Electrical systems & distribution

Compressed air systems

Inert gas systems

Boiler & steam systems

Cooling towers

Water treatment

Sterilization

Material conveyors

Packaging

Office design

Laboratory design

Great visualizers. Able to take drawings to reality.

Kurt Brickley, Port of San Diego

With a solid knowledge of both construction techniques and plant operations, EPS determines the optimal construction strategies based on building codes, permitting requirements, project schedule, and budget. Multi-skilled EPS project managers ensure efficient facilities.

Factory layout

Piping systems

Control systems

Electrical systems & distribution

Compressed air systems

Inert gas systems

Boiler & steam systems

Cooling towers

Water treatment

Sterilization

Material conveyors

Packaging

Office design

Laboratory design

Great visualizers. Able to take drawings to reality.

Kurt Brickley, Port of San Diego

With a solid knowledge of both construction techniques and plant operations, EPS determines the optimal construction strategies based on building codes, permitting requirements, project schedule, and budget. Multi-skilled EPS project managers ensure efficient facilities.

Factory layout

Piping systems

Control systems

Electrical systems & distribution

Compressed air systems

Inert gas systems

Boiler & steam systems

Cooling towers

Water treatment

Sterilization

Material conveyors

Packaging

Office design

Laboratory design

Great visualizers. Able to take drawings to reality.

Kurt Brickley, Port of San Diego

EPS in Action

Cost-effective water discharge system exceeds 100% ROI

An international chemical and pharmaceutical manufacturer wanted to reduce wastewater discharge in a cost-effective manner. It hired one engineering firm that spent more than $100,000 collecting data over several months. When no viable solutions were offered, the company turned to Dr. John Williams of EPS.
In one week, Dr. Williams gathered relevant data through on-site observations and developed an inexpensive usage reduction system. Time to implementation: three weeks. Time wasted: none.